General Contractor:Castagna ConstructionOwner's Project Manager:The Vertex CompaniesArchitect:Context Architecture |
The feasibility study for a new fire station, completed by the architectural firm Dore & Whittier Architects, started in 2014 and at the March 2015 Annual Town Meeting voters approved funds to complete the design and construction of a new Center Fire Station to be located on Boston Road.
Context Architecture, formally Donham & Sweeney, completed the design of the new building in August of 2016. The Fire Station design is for a 19,572 square foot two story building that includes five apparatus bays, a 50-person training room, office and meeting room space on the first floor and dormitory rooms, kitchen, break room and fitness center on the second floor.
The estimated construction cost for the schematic design was $8.7M. After a site plan review, the project received approval from the Westford Planning Board in January 2017. On May 31, 2017, the PTBC recommended that the Board of Selectmen award the construction contract to Castagna Corporation of Newburyport, MA for a total bid amount of $8,767,000. Construction began in August and is expected to be completed in the fall of 2018.
Latest Construction Pictures
-
10-26-18 1st Floor Lobby
-
10-26-18 1st Floor Lobby
-
10-26-18 1st Floor Restroom
-
10-26-18 1st Floor Fire Prevention
-
10-26-18 1st Floor Fire Prevention
-
10-26-18 1st Floor Fire Watch
-
10-26-18 1st Floor Fire Watch
-
10-26-18 1st Floor Training Room
-
10-26-18 1st Floor Training Room
-
10-26-18 1st Floor Office Manager
-
10-26-18 1st Floor Office Manager
-
10-26-18 1st Floor Fire Chief Admin
-
10-26-18 1st Floor Work Room
-
10-26-18 1st Floor Deputy Chief Admin
-
10-26-18 1st Floor ALS Office
-
10-26-18 1st Floor Admin
-
10-26-18 1st Floor Mail Boxes
-
10-26-18 1st Floor Admin Hall Toward Bays
-
10-26-18 1st Floor Conference Room
-
10-26-18 1st Floor Turnout Gear
-
10-26-18 1st Floor Turnout Gear
-
10-26-18 1st Floor Engine Bays
-
10-26-18 1st Floor Engine Bays
-
10-26-18 1st Floor Engine Bays
-
10-26-18 1st Floor Engine Bay
-
10-26-18 1st Floor Engine Bay Evidence Room
-
10-26-18 1st Floor Engine Bay Outdoor Equipment
-
10-26-18 1st Floor Engine Bay SCBA
-
10-26-18 1st Floor Engine Bay Work Shop
-
10-26-18 1st Floor Engine Bay Restroom
-
10-26-18 1st Floor Engine Bay Mezzanine
-
10-26-18 1st Floor Engine Bay from Mezzanine Right
-
10-26-18 1st Floor Engine Bay from Mezzanine
-
10-26-18 1st Floor Engine Bay Decon 1
-
10-26-18 1st Floor Engine Bay Decon 2
-
10-26-18 1st Floor Engine Bay Fire Pole
-
10-26-18 1st Floor Engine Bay Fire Pole 2
-
10-26-18 1st Floor Engine Bay Fire Pole Looking Up
-
10-26-18 1st Floor Engine Bay General Storage
-
10-26-18 1st Floor EMS
-
10-26-18 1st Floor Engine Bay Looking Back
-
10-26-18 1st Floor Engine Bay Looking Toward Lobby
-
10-26-18 1st Floor Electrical Room
-
10-26-18 1st Floor Stairs
-
10-26-18 2nd Floor Storage
-
10-26-18 2nd Floor Lockers
-
10-26-18 2nd Floor Fitness
-
10-26-18 2nd Floor Fitness
-
10-26-18 2nd Floor Laundry
-
10-26-18 2nd Floor Elevator on Left Looking toward Day Room
-
10-26-18 2nd Floor Fire Pole
-
10-26-18 2nd Floor FIre Pole
-
10-26-18 2nd Floor Roof Patio
-
10-26-18 2nd Floor Roof Patio
-
10-26-18 2nd Floor Captain Office
-
10-26-18 2nd Floor Captain Room
-
10-26-18 2nd Floor Dorm Room
-
10-26-18 2nd Floor Dorm Room
-
10-26-18 2nd Floor Dorm Room
-
10-26-18 2nd Floor Dorm Hall
-
10-26-18 2nd Floor Dorm Hall Stairs
-
10-26-18 2nd Floor Looking toward Kitchen
-
10-26-18 2nd Floor Dining Area
-
10-26-18 2nd Floor Dining Area
-
10-26-18 2nd Floor Looking Toward Dorm Hall
-
10-26-18 2nd Floor Kitchen
-
10-26-18 2nd Floor Kitchen
-
10-26-18 2nd Floor Kitchen
-
10-26-18 2nd Floor Kitchen
-
10-26-18 2nd Floor Kitchen
-
10-26-18 2nd Floor Dry Storage
-
10-26-18 2nd Floor Day Room
-
10-26-18 2nd Floor Day Room
-
10-26-18 2nd Floor Day Room
-
10-26-18 2nd Floor Elevator on Right
-
10-26-18 2nd Floor Mail Slots
-
10-26-18 2nd Floor Janitor Closet
-
10-26-18 2nd Floor Restroom
-
10-26-18 2nd Floor Restroom
-
10-26-18 Outside Back
-
10-26-18 Outside Back Towards Bays
-
10-26-18 Outside Entrance
-
10-26-18 Outside Entrance
-
10-26-18 Outside Entrance Parking
-
10-26-18 Outside Front Bays
-
10-26-18 Outside Front Looking Up Boston Road
-
10-26-18 Outside Training Room
-
10-26-18 Outside Training Room
View Gallery of Construction Pictures here
Documents
- Article 7 (PDF)
- Article 8 (PDF)
- Center Fire Station Conditions (PDF)
- Center Fire Station Existing Floor Plans (PDF)
- Center Fire Stations Conceptual Floor Plans (PDF)
- Donham and Sweeney Fire Station Design RFQ (PDF)
- Fire Station Space Needs Program (PDF)
- Presentation for Special Town Meeting (PDF)
- Presentation to Board of Selectmen on Fire Station (PDF)
- RFQ Briefing Session Presentation (PDF)